Finishing Stag Leap – At the Foundry May 7, 2010 The head of Stag Leap is one of 21 pieces that will have to be assembled at the foundry. The main body. An inside view of the additional internal stainless steel structure. The log is being pieced together and added. More body parts. The head is being moved into place. All done!! Tim stands with Stag Leap, after 10 weeks it is now finished being welded together and metal chased. Ready for patina.